Incident Triage & Contract Liability Support

Hit a PipeFound AsbestosStruck a Gas LineFlooded a TrenchCracked a FootingSevered a Conduit?
TIA DraftIncident ReportChange OrderCompliance FilingNotice of Compensable ChangeNotice of Disputed WorkCost ProposalGovernment Code ClaimDiffering Site Condition Is
Ready for Review.

Field incident to drafted change order, RFI, and compliance filing — before the superintendent leaves the trailer. Foyer reads your specs, scope, and contract so you don't have to dig through binders.

9:41
●●●●○ 🔋
Foyer — Site Comms 3 members

Hours saved on compliance paperwork

0
Active construction projects +18.4% this month

From Utility Strike to
Drafted RFI in Seconds

A GC hits an unmarked pipe. Watch Foyer triage the incident, draft the RFI, and prepare notifications — all pending your review before anything goes out.

Foyer Triage System

As field notifications arrive with photos, locations, and voice recordings, Foyer matches contract templates against regulatory spec standards to generate correct legal risk assessed packages instantly.

Awaiting field report streams...
Foyer — Triage Output

Focus on Building
instead of paperwork.

You had a bureaucracy. Now you have a business again.

✉️ When an incident report is filed
If the Liability Exposure is greater than 7.0
⚖️ Route draft package to Legal Counsel + Superintendent
🔬 Notify Structural Expert for review

Set routing rules on autopilot.

Provision notifications, reviews, and sign-offs automatically based on scope, location, contract clause, and custom parameters.

Enterprise Solutions ➔
FOYER
🏗️ Procore
📐 Autodesk Build
📁 Sharepoint

Plugs into any platform for all your contract liability paperwork.

Connects directly to Procore, Autodesk, Sharepoint, or email directories to file drafted RFIs, change orders, and municipal reports.

Global Integration Management ➔

Every Party Connected.
Every Response Coordinated.

Foyer maps your project's stakeholders — from the GC in the field to legal counsel at the firm. The right document reaches the right desk, reviewed by the right expert.

Foyer stakeholder network graph showing General Contractor, Project Manager, Property Owner, Architect of Record, Municipal Authority, Legal Counsel, Structural Engineer, and Insurance Carrier all connected through Foyer's central hub

20 Seconds to a
Drafted Response Package

Every second on a jobsite costs money. Foyer compresses days of document prep into moments — ready for your sign-off.

00:00

Field Report Filed

GC reports utility strike at Grid E-7. Excavation shut down per site safety protocol.

00:03

Scope & Spec Review

Contract scope, project specifications, and municipal code §4.2.1 cross-referenced automatically.

00:08

Risk Assessment Drafted

Liability exposure scored. Delay impact calculated against baseline schedule. Insurance clause 7.3 flagged for review.

00:12

RFI & Notices Prepared

Draft RFI generated for architect. Incident notices to owner and municipal authority prepared — pending PM review.

00:15

Legal & Expert Routing Available

PM can route any draft to legal counsel for liability review or request domain expert feedback before approval.

00:20

Ready for Review

Complete response package queued for PM sign-off. Nothing goes out until you confirm. Full audit trail preserved.

Stop Digging Through Binders.
Start Reviewing Drafts.

Join GCs and project managers who spend less time on paperwork and more time building. Get notified when Foyer launches.

No spam. Early access for construction professionals.